ExP Case Study: Cotton Valley Wellbore Cleanout Dehyderated Drilling Mud and Sand Bridges

East Texas Wellbore Cleanout 10.5 lb Dehydrated Drilling Mud, Plus Sand and Debris in 5 Hours, 22 Minutes with Extreme Pulse Technology (ExP) Location: Cotton Valley, East Texas Problem: 10.5 lb dehydrated drilling mud and sand bridges in wellbore with some scale Objective: Utilize 1.25" CT with the 1.33” ExP BHA [...]

By | January 9, 2018|Best Practices, Technology|

ExP Case Study: Permian Basin Calcium Carbonate Scale Removal Near Wellbore

From 83 bbls To 157 bbls in 4 Hours, 19 Minutes with Extreme Pulse Technology (ExP) Location: Permian Basin, West Texas Problem: Calcium carbonate scale with some Fe in tubing, casing and near wellbore region Objective: Utilize 1.25" CT with the 1.33" ExP BHA for removal of blockages and calcium [...]

By | January 3, 2018|Best Practices, Technology|

ExP Case Study: Haynesville Wellbore Cleanout Drilling Mud and Debris

From 100 ft in 4 Days to 4,560 ft in 3 Hours with Extreme Pulse Technology (ExP) Location: Haynesville, East Texas Problem: 100 feet of progress in four days of drilling due to 10 lb dehydrated (solidified) drilling mud mixed with debris in the wellbore Objective: Utilize 2 7/8" [...]